Case File

Public Record · Case File

The Servpro Roof Failure Case File

229 Lakewood Dr, Carrollton GA · installed by Wilpro Enterprises, Inc., SERVPRO franchisee, Newnan GA

Exhibits

Drop exhibit files into public/exhibits/ and link them here as they are collected.

City of Carrollton 2018 Building Permit File (38 pages)

on file

Complete municipal file for permit 20180234, provided by Building Inspector Kyle Shepherd on July 19, 2026. Contains the building permit issued August 27, 2018 to Wilpro Enterprises-Servpro (license RBQA002039, valuation $224,000, application signed by Greg Marshall), the electrical permit and inspection records, the National General fire-loss estimate (claim L18003950, loss date March 6, 2018), a Servpro of Troup and Coweta supplement estimate, and the final inspection notice of May 29, 2019 approving building and electrical. Establishes the documented substantial-completion date.

View file

Progressive Payment Letter and Repair Estimate (Aug 21, 2024)

on file

The Progressive document both sides cite, obtained from the adjuster July 20, 2026. Page 2 states, under damages that are not covered: 'The policy does not cover for improper installation of your roof.' The investigation found windblown shingles and water intrusion into the kitchen, living room, and master bedroom. Payment covered only the wind and tree portion ($4,839.07 plus $400 tarping against a $2,500 deductible); the estimate's entire roofing category is $627.56, about two squares under the tarps, with $3,000 of the payment being tree removal. Sent to Servpro Sep 4, 2024.

View file

SeekNow roof inspection photos (Jul 31, 2024)

on file

39 pages of on-roof photographs from the SeekNow ladder-assist inspection Progressive commissioned, taken July 31, 2024. Close-ups show shingle courses slid out of position with exposed felt and decking and visible fastener placement, across multiple slopes. Contemporaneous documentation of the failure pattern eleven days after the storm.

View file

Progressive inspection photos (Jul 30, 2024)

on file

66 pages of photographs from the adjuster's July 30, 2024 inspection, covering the roof, elevations, and interior water damage to the kitchen, living room, and master bedroom.

View file

Progressive inspection photos (Aug 14, 2024)

on file

26 pages of follow-up photographs from the August 14, 2024 reinspection, taken after the tree was removed the day before.

View file

Tree-on-house photo (image_6209779.JPG)

needed

Up-close photo of the tree on the home before removal, requested by and provided to Progressive.

Roof failure photos (July-August 2024)

needed

Photos sent to the City of Carrollton (Jul 19) and to Progressive (Aug 13) showing shingles coming off.

Fernando's Tree Service itemized invoice

needed

$2,500 removal from house plus $500 disposal, $3,000 total, paid directly by homeowner. Provided to Progressive Aug 15, 2024.

Progressive policy copy

needed

Policy document emailed Aug 23, 2024.

Certified mail receipt, Right to Repair notice (Jul 23, 2026)

on file

USPS certified mail receipt for the formal Right to Repair Act notice mailed to Ricky Wilson, CEO of Wilpro Enterprises, Inc., at the Villa Rica office. Postmarked July 23, 2026, tracking 9589 0710 5270 3518 1481 93.

View file

USPS delivery confirmation, Right to Repair notice (Jul 27, 2026)

on file

USPS tracking record for 9589 0710 5270 3518 1481 93 captured July 28, 2026, showing 'Delivered, Left with Individual' at 12:17 PM on July 27, 2026 in Villa Rica, GA 30180, with the full scan history back to acceptance in Carrollton on July 23. Fixes the receipt date that starts the 30-day statutory response period.

View file

USPS product information, certified notice (captured Jul 28, 2026)

on file

USPS tracking product detail for 9589 0710 5270 3518 1481 93: postal product First-Class Mail, feature Certified Mail. Corroborates that the Right to Repair notice went out by certified mail as O.C.G.A. 8-2-36 requires.

View file

USPS delivery signature record (held privately)

on file

USPS Product Tracking and Reporting 'Delivery Signature and Address' record for 9589 0710 5270 3518 1481 93, printed by the Carrollton Post Office on July 28, 2026, confirming delivery on 07/27/2026 at 12:17:00 and showing the recipient's handwritten signature. Held in the case file and not published here: the printout carries a USPS internal-use notice and reproduces a third party's signature. The recipient's printed name is not on this record, so PS Form 3811-A is still worth filing to obtain it.

Certified mail receipt, document request to Wilpro (Aug 4, 2026)

on file

Stamped PS Form 3800 certified mail slip and register receipt for the August 4, 2026 document request to Ricky Wilson, CEO of Wilpro Enterprises, Inc., mailed from the Carrollton Post Office at 4:22 PM with Return Receipt (green card) requested at time of mailing. Certified tracking 9589 0710 5270 3518 1192 92; return receipt tracking 9590 9402 0167 6110 8740 76. Estimated delivery August 7, 2026. The signed green card will be added as an exhibit when USPS returns it.

View file

Document request letter to Wilpro, as mailed (Aug 4, 2026)

on file

The August 4, 2026 letter to Ricky Wilson, CEO and registered agent of Wilpro Enterprises, Inc., exactly as mailed by Certified Mail with Return Receipt. Requests the written warranty, the signed contract and job file, the roofing vendor's identity and invoices, the notes and reports of Wilpro's own personnel including estimator Brian Wright, and whatever documents support Wilpro's asserted 2018 completion date, with a request to state in writing if any document does not exist. A copy was emailed to Michelle George on August 6, 2026.

View file

Servpro invoice and account references

on file

Invoice # 4967618, Account # 4475070 (provided to Progressive Aug 16, 2024).

Pre-rebuild listing photo: the original chimney chase

on file

Real estate listing photo of 229 Lakewood Dr from before the 2018 fire rebuild, showing the original chimney as built: a framed chase with lap siding and a metal flue cap, no masonry. This is the structure the 2018 crew cut off instead of flashing, and the structure the homeowner asked Wilpro on August 13, 2026 to put back. Sent to Michelle George with the morning emails of August 13.

View file

Tear-off photo: shingles wrapped over the rake edge, no drip edge (Aug 13, 2026)

on file

Taken during the August 13, 2026 tear-off. At the rake edges of the 2018-2019 installation, the field shingles were folded down over the edge of the roof in place of drip edge metal, with bare OSB behind them. The crew performing the tear-off described the installation as the worst they had seen. Drip edge was one of the scope items the homeowner had asked Wilpro to confirm in writing since August 7.

View file

Tear-off photo: roof stripped to decking (Aug 13, 2026)

on file

The rear slope stripped to bare decking on tear-off day, August 13, 2026, with the removed 2018 shingles staged on tarps below. Documents that the repair underway is a complete tear-off and replacement of the 2018-2019 roof.

View file

Tear-off photo: rotted fascia at the eave, where drip edge should have been (Aug 13, 2026)

on file

The eave edge behind the gutter line after tear-off, showing rotted and separated fascia where water ran off the bare sheathing edge for eight years. Drip edge, required at eaves and rakes by the Georgia residential code since January 1, 2014 (IRC 2012, R905.2.8.5), was never installed on the 2018-2019 roof. An independent roofing consultant from Rooftech Consulting attributed this damage to the missing drip edge during an on-site visit the same day.

View file

Crawlspace photo: the base of the furnace flue riser (Aug 13, 2026)

on file

Beneath the house, the furnace vent connector elbows into the original galvanized flue riser, which passes up through the floor framing and runs through the entire house to the roof. At the top of that run stood the chimney chase the 2018 crew cut off. The entire riser is concealed inside the structure; its condition at the roof was only exposed by the August 13 tear-off.

View file

Crawlspace photo: furnace and vent connector (Aug 13, 2026)

on file

The gas furnace in the crawlspace with its exhaust vent connector rising off the cabinet toward the flue riser. The elbow on this connector has already been replaced once since the rebuild. Documents the appliance whose exhaust depends on the flue run the 2018 crew left without its chimney.

View file

New underlayment down, with openings cut for the chimney pipe and furnace vent (Aug 13, 2026)

on file

The new synthetic underlayment installed over the decking, shingle bundles staged on the ridge, with openings cut where the fireplace chimney pipe and furnace vent will pass through the new roof, beside the plumbing vent. Taken the same day the homeowner asked Wilpro in writing not to permanently seal the flue openings under the new roof. The penetrations are being brought through rather than covered over.

View file

Completion photo: the new roof and the rebuilt chimney chase (Aug 20, 2026)

on file

The completed replacement roof, GAF Timberline NS architectural shingles in Charcoal, with the rebuilt chimney chase framed, sided, and trimmed above the ridge line. The chase awaits its cap and the flue and vent piping that pass through it. Seven days before this photo, Wilpro's written position was that it could 'only redo the roof.' This is the structure its 2018 crew removed, back on the house.

View file